Rhode Island Dumpster Rental During Summer
Summer in Rhode Island brings perfect weather, extended daylight, and ideal conditions for major home improvement projects. As temperatures peak and vacation schedules settle, homeowners across the Ocean State tackle ambitious renovations, outdoor projects, and property improvements. This comprehensive guide covers everything you need to know about renting 15-yard and 20-yard dumpsters during Rhode Island's busy summer season.
Summer is Peak Season for Major Home Projects in Rhode Island
Summer represents the optimal time for substantial home improvements:
Perfect Working Conditions:
- Warmest temperatures (70-85°F)
- Longest daylight hours (sunrise 5am, sunset 8pm)
- Minimal precipitation
- Consistent warm, dry weather
- Ideal for indoor and outdoor work simultaneously
Extended Project Timeline:
- Long days mean more working hours
- Weekends feel longer and more productive
- Kids out of school (help or flexibility)
- Vacation time availability
- No weather delays compared to other seasons
Outdoor Project Season:
- Only reliable time for exterior work
- Roofing projects peak
- Siding and window replacement
- Deck building and replacement
- Landscaping integration with construction
- Painting exterior surfaces
Peak Demand Period:
- Contractors fully booked
- Dumpster demand highest
- Real estate transactions closing
- Moving season continues
- Tourist property preparations
15-Yard and 20-Yard Dumpsters: Rhode Island Summer Projects
These versatile dumpsters handle intensive summer renovation projects:
15-Yard Dumpster (12' L × 7.6' W × 4.6' H)
- Capacity: 4-5 pickup truck loads
- Weight limit: 2 tons included (tire fees may apply and vary by size)
- Rental period: Up to 7 days
- Additional days: $8/day
- Extra weight: $140/ton over limit
- Best for: Single room renovations, moderate roof repairs, garage projects, bathroom/kitchen remodels
- Summer price: $475.00
- Fits in: Standard driveways without blocking summer activities
20-Yard Dumpster (14' L × 8' W × 6.5' H)
- Capacity: 6-8 pickup truck loads
- Weight limit: 2 tons included (tire fees may apply and vary by size)
- Rental period: Up to 7 days
- Additional days: $8/day
- Extra weight: $140/ton over limit
- Best for: Complete roofing projects, full deck builds, major renovations, whole-home exterior work
- Summer price: $540.00
- Fits in: Most residential properties, extra height (6.5') perfect for dimensional lumber and roofing materials
Why These Sizes Dominate Summer:
- Perfect for major renovation projects
- Adequate for roofing and exterior work
- Manageable size for residential properties
- Cost-effective for substantial projects
- 7-day rental accommodates intensive summer work schedules
- Balance of capacity without overwhelming your property
Summer Dumpster Rental Costs in Rhode Island
Rhode Island summer dumpster pricing from Rockhouse Disposal:
15-Yard Dumpster Summer Pricing:
- Base price: $475.00
- Rental period: Up to 7 days included
- Weight allowance: 2 tons included
- Additional days: $8/day (affordable for extended projects)
- Weight overage: $140/ton over 2-ton limit
- Tire fees: May apply and vary by size
20-Yard Dumpster Summer Pricing:
- Base price: $540.00
- Rental period: Up to 7 days included
- Weight allowance: 2 tons included
- Additional days: $8/day (great value for longer projects)
- Weight overage: $140/ton over 2-ton limit
- Tire fees: May apply and vary by size
What's Included:
- Delivery throughout Rhode Island
- Up to 7-day rental period
- Pickup and proper disposal
- 2-ton weight allowance
- Customer support throughout rental
Summer Booking Considerations:
- Book 2-3 weeks ahead - Summer is very busy
- July 1st: Major moving day (second only to June 1st)
- July 4th week: Popular vacation project time
- August: Back-to-school preparation rush
- Labor Day weekend: Final summer projects
- Tourist areas especially busy (coastal properties)
- Contractor schedules packed
- Consistent pricing (no summer surcharges at Rockhouse)
Top Summer Projects for 15-Yard Dumpsters in Rhode Island
The 15-yard dumpster (12' × 7.6' × 4.6') is perfect for:
Kitchen Renovations:
- Summer = best time for major kitchen work
- Eat outdoors while kitchen unusable
- Cabinet removal and disposal
- Countertop demolition
- Flooring replacement
- Old appliance disposal
- Complete kitchen guts
- 2-ton capacity handles standard kitchens
Bathroom Remodels:
- Master bathroom updates
- Guest bathroom additions
- Vanity and fixture removal
- Complete tile demolition
- Shower/tub replacements
- Multiple bathroom updates
- Summer timing means window open for ventilation
Garage Conversions:
- Converting to living space
- Workshop creation
- Summer organization projects
- Removing decades of accumulation
- Making air-conditioned workspace
- ADU (Accessory Dwelling Unit) preparations
Small to Medium Roofing Projects:
- Garage roof replacement
- Shed roofing
- Small home sections
- Roof repair debris
- Old shingles disposal (watch weight!)
- Flashing and trim disposal
Basement Projects:
- Summer = driest basements
- Finishing unfinished spaces
- Removing old paneling
- Creating cool summer retreats
- Home theater installations
- Workout room creation
Single Room Renovations:
- Bedroom updates
- Home office creation
- Living room remodels
- Sunroom additions
- Mudroom updates
Partial Deck Projects:
- Deck repair sections
- Railing replacement
- Board replacement
- Small deck removal
- Stairs and landing work
Top Summer Projects for 20-Yard Dumpsters in Rhode Island
The 20-yard dumpster (14' × 8' × 6.5') is ideal for:
Complete Roofing Projects:
- Full home re-roofing
- Asphalt shingle removal (heavy!)
- Old underlayment disposal
- Trim and flashing
- Gutter replacement
- Summer = only reliable roof season
- Extra height (6.5') accommodates bundles
- IMPORTANT: Roofing is HEAVY - may hit 2-ton limit with smaller roof
Full Deck Removal and Replacement:
- Complete deck demolition
- Old railing and post removal
- Deck boards and joists
- Concrete pier disposal
- Summer timing perfect (complete and enjoy)
- 20-yard handles average Rhode Island deck
- Extra capacity for unexpected rot
Siding Replacement Projects:
- Full home residing
- Old vinyl, wood, or aluminum removal
- Trim and soffit disposal
- Preparing for new installation
- Summer = best weather for siding
Multiple Room Renovations:
- Kitchen AND bathrooms simultaneously
- Whole-floor gut renovations
- Open-concept conversions
- Taking advantage of summer contractor availability
- Kids out of school = less disruption
Garage Additions or Replacements:
- Old garage demolition
- Building new garage
- Converting to living space
- Major structural work
- Summer timeline ideal
Fence Installation Projects:
- Old fence removal (entire property)
- Privacy fence replacement
- Decorative fence installation
- Property line updates
- Posts, rails, pickets disposal
Patio and Outdoor Living Construction:
- Removing old patios
- Demolishing concrete/pavers
- Preparing for new construction
- Outdoor kitchen demolition
- Fire pit area clearing
Estate Cleanouts:
- Summer = comfortable working conditions
- Entire home contents
- Multi-generational accumulations
- Preparing for sale
- Moving assistance
Pool Removal Projects:
- Above-ground pool dismantling
- Deck around pool removal
- Old pool equipment disposal
- Preparing yard for new use
- Summer timing logical
Rhode Island Summer Weather and Dumpster Rentals
Understanding summer conditions maximizes your rental:
June in Rhode Island:
- Average temps: 65-75°F
- Early summer warmth
- Most reliable weather month
- June 1st moving day demand
- Graduation season projects
- Best month for starting major work
July in Rhode Island:
- Average temps: 70-80°F
- Peak summer heat
- Hottest month
- July 4th week projects
- Vacation timing coordination
- Work early morning/evening during heat waves
August in Rhode Island:
- Average temps: 70-80°F
- Continued warm weather
- Back-to-school preparation rush
- Hurricane season awareness (rare but possible)
- Late summer project completion
- Labor Day weekend deadline
Summer Weather Advantages:
- Most consistent weather of any season
- Minimal rain compared to spring/fall
- Long daylight (work until 8pm!)
- Predictable conditions
- Rare weather delays
- Perfect for scheduling
Regional Summer Variations:
Providence and Urban Areas:
- Urban heat island effect (5-10° warmer)
- Hot summers in triple-deckers
- Central air conditioning prompts indoor projects
- Peak summer activity
Coastal Rhode Island (Newport, Narragansett):
- Ocean breeze moderates heat
- Most comfortable summer working conditions
- Tourist season impacts (traffic, parking)
- Beautiful summer weather
- Highest demand coastal areas
Northern Rhode Island (Woonsocket, Burrillville):
- Slightly cooler than urban areas
- Less humidity
- Comfortable working temperatures
- Strong summer project season
South County (Washington County):
- Beach season impacts scheduling
- Vacation property work
- Beautiful rural summer
- Tourist traffic considerations
Summer Dumpster Placement Strategies for Rhode Island
Ideal Summer Placement Locations:
Driveways:
- Best option: Stable, accessible surface
- 15-yard (12' long) maintains vehicle access
- 20-yard (14' long) manageable in most driveways
- IMPORTANT: Protect asphalt from heat!
- Summer heat softens asphalt
- Use plywood boards to prevent sinking
- Consider driveway protection essential in July/August
Side Yards:
- Good alternative for summer
- Ground firm and dry
- Easier access than other seasons
- Away from gardens and landscaping
- Clear of sprinkler systems
- Maintain shade for workers if possible
Front Yard/Lawn:
- Acceptable but consider aesthetics
- Summer = neighbors notice
- Tourists/visitors see it (coastal areas)
- Ground firm enough to support
- Away from active lawn areas
- Consider property appearance
Avoiding Summer Heat Damage:
- ALWAYS use plywood under dumpster on asphalt (June-August)
- Dumpster weight + heat = permanent driveway marks
- Especially critical during heat waves
- Small investment prevents expensive driveway repairs
Summer Placement Considerations:
- Away from children's play areas
- Clear of backyard BBQs and entertaining
- Not blocking pool access
- Away from gardens and watering areas
- Maintain access to outdoor living spaces
- Consider summer social activities
- Tourist area parking considerations
What You Can Put in Summer Dumpsters in Rhode Island
Accepted Materials (Summer Projects):
Roofing Materials:
- Asphalt shingles (HEAVY - watch weight!)
- Underlayment and felt paper
- Flashing and trim
- Old gutters and downspouts
- Roof vents and caps
- Note: Full roof may approach or exceed 2-ton limit
Exterior Renovation Debris:
- Siding (vinyl, wood, aluminum, fiber cement)
- Trim and soffit materials
- Old windows and doors
- Deck materials (wood, composite)
- Fence materials (wood, vinyl, chain link)
- Exterior insulation
Interior Renovation Debris:
- Kitchen cabinets, countertops, flooring
- Bathroom fixtures, tile, vanities
- Drywall, lumber, trim
- Carpet and flooring materials
- Insulation (non-asbestos)
Outdoor Living Materials:
- Patio pavers and stones
- Concrete (limited amounts)
- Deck furniture (broken/unwanted)
- Outdoor structures
- Shed materials
- Pool equipment
Furniture and Household Items:
- Old furniture being replaced
- Mattresses and box springs
- Appliances (refrigerators, stoves, washers)
- Carpets and area rugs
- General household cleanout items
Prohibited Items:
- Tires (tire fees may apply and vary by size - separate disposal)
- Hazardous materials (paint, chemicals, pool chemicals, gasoline)
- Batteries and electronics
- Propane tanks
- Asbestos materials
- Wet paint or liquids
- Tree stumps and excessive dirt
Summer-Specific Weight Considerations:
- Roofing shingles are VERY HEAVY
- Concrete and pavers add weight quickly
- Hot weather doesn't affect weight limits
- Water weight from unexpected summer rain
- Stay within 2-ton limit ($140/ton overage)
Heavy Material Projects: Understanding Weight Limits
Summer projects often involve heavy materials:
Roofing Weight Examples:
- 10 squares (1,000 sq ft) of shingles: ~2,000-3,000 lbs
- Typical Rhode Island home roof: 15-20 squares
- Full roof often exceeds 2-ton limit
- Consider this when choosing size
- Both 15-yard and 20-yard have same 2-ton limit
Concrete and Masonry:
- Very heavy materials
- Patio removal can be multiple tons
- Brick chimney demolition extremely heavy
- May need dedicated concrete dumpster
- Check before loading heavy materials
Deck Materials:
- Pressure-treated wood moderately heavy
- Average deck usually under 2 tons
- Wet wood weighs more
- Composite decking lighter than wood
Managing Weight:
- Both sizes include 2 tons
- Size difference is volume, not weight allowance
- Heavy materials: consider 15-yard to stay under weight
- Light materials: 20-yard for volume
- $140/ton overage is reasonable
- Ask if uncertain about weight
Summer Roofing Projects: Rhode Island's Busiest Season
Roofing drives massive summer dumpster demand:
Why Summer for Roofing:
- Only reliable weather window
- Shingles seal properly in heat
- Dry weather essential
- Extended daylight for fast work
- Contractor availability (though busy)
15-Yard for Partial Roofing:
- Garage roofs
- Shed roofing
- Small home sections (500-800 sq ft)
- Roof repair areas
- Dormer work
20-Yard for Complete Roofs:
- Full home re-roofing
- Standard Rhode Island home (1,200-1,800 sq ft roof)
- More volume for shingle bundles
- Room for underlayment and trim
- Most common choice for roofing
Roofing Weight Management:
- Asphalt shingles are heaviest material
- May exceed 2-ton limit on larger homes
- Spread disposal over multiple dumpsters if needed
- Communicate roof size to rental company
- Budget for potential overage
Rhode Island Roofing Considerations:
- Triple-deckers = large roof area
- Colonial homes = substantial roofing
- Ranch homes = manageable size
- Historic homes = often slate or tile (VERY heavy)
Deck Building and Replacement: Summer
Summer = deck season in Rhode Island:
Why Summer for Decks:
- Complete and enjoy same season
- Perfect weather for construction
- Wood needs dry conditions
- Outdoor living season
- Before fall entertaining
15-Yard for Deck Projects:
- Small decks (8x10 to 10x12)
- Deck repairs and partial replacement
- Railing replacement
- Stair rebuilding
- Pressure washing cleanup
20-Yard for Deck Projects:
- Average Rhode Island decks (12x16 to 16x20)
- Complete demolition and replacement
- Multi-level decks
- Deck with stairs and railings
- Unexpected rot discoveries
- Extra height (6.5') perfect for dimensional lumber
Deck Project Timeline:
- Week 1: Demolition and disposal
- Week 2-3: New construction
- 7-day rental perfect for demo phase
- Schedule dumpster for demolition week
Summer Moving Season: July 1st Rush
Moving continues strong through summer:
July 1st Moving Day:
- Second-busiest moving day (after June 1st)
- Lease turnover date
- Book 2-3 weeks ahead minimum
- High dumpster demand
- Student housing transitions
Summer Moving Advantages:
- Warm, dry weather
- Extended daylight for loading
- School out (kids can help)
- Vacation time availability
- Easier than winter moves
15-Yard for Apartment Moves:
- 1-2 bedroom cleanouts
- Moderate furniture disposal
- Condo turnover
- Studio to small apartment
20-Yard for House Moves:
- 3+ bedroom homes
- Garage and basement contents
- Entire home cleanouts
- Estate transitions
- Downsizing moves
Vacation Property Preparation
Coastal Rhode Island sees intense summer activity:
Summer Rental Preparations:
- Between-guest turnover
- Disposing of damaged items
- Updating worn furnishings
- Preparing for peak season
- Quick turnaround needed
Seasonal Property Updates:
- Opening for summer season
- Renovations during vacancy
- Preparing for family use
- Maintenance projects
- Getting ready for rentals
Popular Coastal Areas:
- Newport summer cottages
- Narragansett beach houses
- Watch Hill properties
- Block Island seasonal homes
- Westerly waterfront
Timing Considerations:
- Early summer (before July 4th)
- Between rental periods
- Quick project completion
- Tourist season impacts
- Parking and access challenges
Rhode Island Summer Renovation Timeline
Typical Summer Project Schedule:
Early June:
- Projects launching post-graduation
- June 1st moving cleanouts
- Beginning major renovations
- Weather optimal
- Contractor schedules filling
July (Peak Summer):
- Highest activity month
- Most ambitious projects
- July 1st moving surge
- July 4th week vacation projects
- Hottest weather (work early/late)
August:
- Rushing to complete before school
- Back-to-school deadline projects
- Labor Day weekend target
- Late summer push
- Preparing for fall
Summer Project Booking Timeline:
3-4 Weeks Before Project:
- Request quote immediately
- Choose 15-yard ($475) or 20-yard ($540)
- Reserve specific dates
- Confirm contractor timeline
- Material delivery coordination
2 Weeks Before:
- Confirm dumpster delivery
- Prepare placement area
- Have plywood ready for asphalt protection
- Notify neighbors (summer = people notice)
- Final contractor confirmation
1 Week Before:
- Double-check all details
- Ensure driveway access clear
- Remove vehicles day before
- Clear work area
- Weather check (usually good!)
Delivery Day:
- Early morning delivery typical
- Begin work immediately (long days!)
- Start strong with good weather
- Load systematically
Days 2-7:
- Take advantage of long daylight
- Work morning and evening (avoid midday heat)
- Steady, consistent progress
- Enjoy summer weather
- 7 days included in price
Day 8+ (If Needed):
- Only $8/day extensions
- Summer projects often run long (ambitious)
- Affordable flexibility
- Weather rarely causes delays
Comparing 15-Yard vs. 20-Yard for Summer Projects
Choose 15-Yard Dumpster (12' × 7.6' × 4.6') when:
- Single room renovation
- Small to medium roofing (under 1,000 sq ft)
- Bathroom or kitchen (not both)
- Partial deck projects
- Garage organization
- Apartment/condo cleanouts
- Budget priority ($475 vs. $540)
- Smaller driveway
- Heavy materials (stay under 2 tons)
Choose 20-Yard Dumpster (14' × 8' × 6.5') when:
- Complete roofing projects
- Full deck removal/replacement
- Multiple room renovations
- Siding replacement
- Large estate cleanouts
- "Better safe than sorry" on volume
- Extra height needed (6.5')
- Ambitious summer projects
- Only $65 more than 15-yard
- Volume more important than weight
Summer Project Considerations:
- Summer = most ambitious projects
- Long days encourage larger scopes
- Better to have extra space
- Can't easily add second dumpster (peak demand)
- 20-yard extra height helps with lumber
- Both have same 2-ton weight limit
- Both include 7 days
- Both only $8/day extensions
- Consider project ambition level
Protecting Your Property in Summer Heat
Asphalt Driveway Protection:
- CRITICAL in summer: Always use plywood
- July-August heat softens asphalt
- Dumpster weight creates permanent depressions
- 3/4" plywood sheets recommended
- Place under all contact points
- Small investment prevents $1,000+ repairs
Lawn Protection:
- Summer lawns stressed by heat
- Avoid placing on grass if possible
- If necessary, use plywood protection
- Won't recover as quickly as spring/fall
- Water areas after dumpster removal
Sun Exposure:
- Paint cans explode in heat (never put in dumpster!)
- Some materials expand in heat
- Keep flammable materials out
- Cover if storing anything temperature-sensitive
Maintaining Access:
- Don't block pool access
- Keep clear of outdoor entertaining areas
- Consider summer social activities
- Maintain shade areas if possible
- Plan around summer lifestyle
Summer Dumpster Rental FAQs - Rhode Island
Q: How much does a complete roof cost in the dumpster? A: Roofing is heavy! A 1,500 sq ft roof (typical RI home) is approximately 2-3 tons. May exceed the included 2-ton limit, resulting in $140/ton overage - still very reasonable.
Q: Will the dumpster damage my asphalt driveway in summer? A: Only if you don't protect it! Always use plywood boards under the dumpster during summer months. The weight plus heat can create permanent depressions.
Q: How far in advance should I book for July? A: 2-3 weeks minimum. July 1st moving day and July 4th week are especially busy. Book as early as possible.
Q: Can I work on my project in the heat? A: Yes! Work early morning (6-10am) and evening (6-9pm) when it's cooler. Avoid midday heat in July/August. Long summer days give you flexibility.
Q: What's the difference between 15-yard and 20-yard? A: 15-yard (12' × 7.6' × 4.6') is $475, 20-yard (14' × 8' × 6.5') is $540. Both include 2 tons and 7 days. The 20-yard offers more height and volume - better for roofing and deck projects.
Q: Can I put my old deck in a dumpster? A: Yes! An average Rhode Island deck (12x16) fits in a 20-yard dumpster. Pressure-treated wood is moderately heavy but usually stays under 2 tons.
Q: Should I rent 15-yard or 20-yard for roofing? A: 20-yard for complete roofs. The extra height (6.5') helps with shingle bundles and provides volume for a full roof. Both have the same 2-ton weight limit though.
Q: What if my summer project takes longer than 7 days? A: Extensions are only $8/day. Summer projects often are ambitious and run long. Very affordable to extend.
Q: Is summer more expensive? A: Not at Rockhouse Disposal! Our prices stay consistent: $475 for 15-yard, $540 for 20-yard year-round. No summer surcharges.
Q: Can I complete a kitchen remodel in one week? A: Demolition yes, complete remodel no. Most people rent for the demolition/disposal phase (week 1), then contractors work on rebuilding (weeks 2-4).
Q: What about tourist traffic in coastal areas? A: Request early morning deliveries to avoid traffic. Notify neighbors in dense areas. Tourist season does impact parking and access in Newport, Narragansett, and beach communities.
Q: Will summer rain affect my dumpster? A: Summer rain is minimal in Rhode Island. Quick afternoon thunderstorms occasionally. Cover dumpster if storing absorbent materials long-term, but generally not an issue.
Providence Summer Renovation Intensity
Rhode Island's capital stays busy all summer:
Federal Hill:
- Triple-decker updates
- Roofing projects dominate
- Kitchen/bathroom remodels
- 15-yard (12' long) navigates narrow streets
East Side:
- Property maintenance between academic years
- Landlord summer updates
- Historic home careful work
- 20-yard (14' long) for substantial projects
Downtown & Jewelry District:
- Loft renovations
- Modern condo updates
- Rooftop deck projects
- Both sizes in demand
Providence Summer Advantages:
- Central location = quick delivery
- Multiple contractors available
- Urban infrastructure handles traffic
- Hot city summers inspire AC installation projects
Warwick Suburban Summer Projects
Warwick sees intense deck and exterior work:
Popular Warwick Summer Projects:
- Deck replacements (very common)
- Full home roofing
- Siding updates
- Garage additions
- Pool area updates
Warwick Advantages:
- Excellent driveway space
- Suburban property access
- Room for dumpsters and materials
- Strong contractor availability
- Family-friendly project timing
Warwick Neighborhoods:
- Warwick Neck: Coastal property updates
- Conimicut: Waterfront deck work
- Oakland Beach: Seasonal property maintenance
- Apponaug: Suburban renovations
Cranston Summer Home Improvements
Cranston's diverse housing supports varied projects:
Common Cranston Summer Projects:
- Colonial home roofing
- Deck additions (backyards)
- Kitchen remodels (AC makes bearable)
- Garage conversions
Edgewood District:
- Historic home exterior work
- Careful summer maintenance
- Quality material disposal
- 15-yard ($475) for measured work
Western Cranston:
- Newer construction updates
- Modern amenities additions
- Family-focused projects
- Both sizes popular
Coastal Rhode Island Summer Demand
Newport and shore areas peak in summer:
Newport Summer Projects:
- Historic cottage maintenance
- Preparing for peak tourist season
- Mansion estate work
- Seasonal property openings
Tourism Impact:
- Highest demand area
- Traffic considerations
- Parking challenges
- Book well in advance (3-4 weeks)
- Early morning deliveries recommended
Narragansett & South County:
- Beach house renovations
- Summer rental property updates
- Between-tenant work
- Quick turnaround essential
Block Island:
- Limited access (ferry required)
- Seasonal property work
- Advance planning critical
- Specialized logistics
Northern Rhode Island Summer Season
Woonsocket and surrounding areas:
Summer Project Focus:
- Roofing peak season
- Exterior painting
- Deck building
- Home improvements
Advantages:
- Less tourist traffic
- Good contractor availability
- Comfortable summer temperatures
- Strong DIY community
- Affordable project costs
Rockhouse Disposal provides reliable 15-yard and 20-yard dumpster rentals throughout Rhode Island all summer long. We understand summer's unique rhythm - the ambitious project scopes that long days inspire, the peak demand that requires advance planning, the importance of protecting your driveway from summer heat, and the need for flexible, dependable service when you're trying to complete major work during the best weather of the year.
Why Choose Rockhouse Disposal for Summer Projects:
✓ Two perfect sizes - 15-yard ($475) and 20-yard ($540) for all summer projects
✓ Consistent pricing - No summer surcharges despite peak demand
✓ Generous rental period - Up to 7 days perfect for intensive summer work
✓ Affordable extensions - Only $8/day when ambitious projects run long
✓ Fair weight limits - 2 tons included (reasonable overage at $140/ton)
✓ Experienced in peak season - We handle summer's high demand professionally
✓ Advance booking recommended - Secure your dates 2-3 weeks ahead
✓ Driveway protection advice - We remind you about summer heat concerns
✓ Flexible delivery - Early morning slots to avoid summer heat and traffic
✓ Local Rhode Island expertise - We know your community's summer needs
✓ Professional service - Reliable team even during busiest season
Don't wait until summer arrives to book your dumpster - peak season (July especially) requires advance planning. Take advantage of Rhode Island's long summer days, complete those major projects while weather is guaranteed to cooperate, and transform your property during the most productive season of the year.
Contact us today to reserve your summer dumpster rental. Book now for July and August projects - $475 for 15-yard or $540 for 20-yard, including 7 days, 2 tons, and the peace of mind that comes with planning ahead during peak season.











